Assess your own site, or browse sites already listed.
Already have an address in mind? Get a free Screening on it below, or browse sites listed for sale, lease, or conversion.
Why the ranking holds up
A site cannot average its way out of having no power.
In our scoring, power is non-negotiable: cheap land, incentives, and fiber never lift a site that cannot be powered. A pretty-but-powerless parcel never ranks high.
Build: sites already fit for AI/HPC
Sites currently listed for sale or lease, purpose-fit for AI/HPC. Local moratorium and zoning status is not yet assessed for listed sites.
| Region | Type | Spec | Available | Timing | Term | Cooling | Tier | |
|---|---|---|---|---|---|---|---|---|
| OH | AI/HPC site | BUY, grid power | 200 MW | August 2026 | Ask | Request detailsor send requirements | ||
| CanadaCA | AI/HPC site | BUY, grid power, greenfield | 100 MW | August 2026 | Ask | Request detailsor send requirements | ||
| IL | AI/HPC site | LEASE, solar power, 3 sites | 30 MW | July 2026 | Ask | Request detailsor send requirements | ||
| ABCA | AI/HPC site | LEASE, natural gas | 20 MW | May 2026 | Ask | Request detailsor send requirements | ||
| OR | AI/HPC site | BUY | 2.5 MW | June 2026 | Ask | Request detailsor send requirements | ||
| NC | AI/HPC site | BUY, grid power | 2 MW | March 2026 | Ask | Request detailsor send requirements |
Convert: powered sites available to repurpose
Former sites for sale or lease, with power, land, and permits already secured. Upgradable for AI/HPC density. Local moratorium and zoning status is not yet assessed for listed sites.
| Region | Type | Spec | Available | Timing | Term | Cooling | Tier | |
|---|---|---|---|---|---|---|---|---|
| ABCA | Old site | natural gas, 10 sites | 50 MW | March 2026 | Ask | Request detailsor send requirements | ||
| OR | Old site | hydro power | 20 MW | April 2025 | Ask | Request detailsor send requirements | ||
| KY | Old site | 20 MW | May 2025 | Ask | Request detailsor send requirements | |||
| UT | Old site | 2 sites | 14 MW | April 2025 | Ask | Request detailsor send requirements | ||
| TX | Old site | warehouse building, 8.5k sq ft | 12 MW | August 2026 | Ask | Request detailsor send requirements | ||
| TX | Old site | warehouse building, 3k sq ft | 6 MW | August 2026 | Ask | Request detailsor send requirements | ||
| TX | Old site | warehouse building, 3.3k sq ft | 5 MW | August 2026 | Ask | Request detailsor send requirements | ||
| MBCA | Old site | 5 MW | June 2026 | Ask | Request detailsor send requirements | |||
| GA | Old site | 3 MW | November 2025 | Ask | Request detailsor send requirements | |||
| TX | Old site | warehouse building, 1.5k sq ft | 3 MW | August 2026 | Ask | Request detailsor send requirements | ||
| TX | Old site | 2.5 MW | May 2026 | Ask | Request detailsor send requirements |
Power, land, and permits are already secured; cooling and electrical upgrades are on you for AI/HPC density.
The same engine, watching by county.
Every scored site rolls up into a national county index. The counties pulsing below rank in the top ten percent for power readiness nationwide, kept current as new sites come in.
What we score
Fifteen scored dimensions across power, land, permitting, and risk. Each one is named and shown on your result, never buried inside a formula.