Find a Site

Assess your own site, or browse sites already listed.

Already have an address in mind? Get a free Screening on it below, or browse sites listed for sale, lease, or conversion.

Why the ranking holds up

A site cannot average its way out of having no power.

In our scoring, power is non-negotiable: cheap land, incentives, and fiber never lift a site that cannot be powered. A pretty-but-powerless parcel never ranks high.

Build: sites already fit for AI/HPC

Sites currently listed for sale or lease, purpose-fit for AI/HPC. Local moratorium and zoning status is not yet assessed for listed sites.

Sites listed
6
sites
Capacity listed
354.4 MW
sum of listed loads
RegionTypeSpecAvailableTimingTermCoolingTier
OHAI/HPC siteBUY, grid power200 MWAugust 2026AskRequest detailsor send requirements
CanadaCAAI/HPC siteBUY, grid power, greenfield100 MWAugust 2026AskRequest detailsor send requirements
ILAI/HPC siteLEASE, solar power, 3 sites30 MWJuly 2026AskRequest detailsor send requirements
ABCAAI/HPC siteLEASE, natural gas20 MWMay 2026AskRequest detailsor send requirements
ORAI/HPC siteBUY2.5 MWJune 2026AskRequest detailsor send requirements
NCAI/HPC siteBUY, grid power2 MWMarch 2026AskRequest detailsor send requirements

Convert: powered sites available to repurpose

Former sites for sale or lease, with power, land, and permits already secured. Upgradable for AI/HPC density. Local moratorium and zoning status is not yet assessed for listed sites.

Sites listed
11
sites
Secured power
140.5 MW
sum of secured capacity
Conversion required
RegionTypeSpecAvailableTimingTermCoolingTier
ABCAOld sitenatural gas, 10 sites50 MWMarch 2026AskRequest detailsor send requirements
OROld sitehydro power20 MWApril 2025AskRequest detailsor send requirements
KYOld site20 MWMay 2025AskRequest detailsor send requirements
UTOld site2 sites14 MWApril 2025AskRequest detailsor send requirements
TXOld sitewarehouse building, 8.5k sq ft12 MWAugust 2026AskRequest detailsor send requirements
TXOld sitewarehouse building, 3k sq ft6 MWAugust 2026AskRequest detailsor send requirements
TXOld sitewarehouse building, 3.3k sq ft5 MWAugust 2026AskRequest detailsor send requirements
MBCAOld site5 MWJune 2026AskRequest detailsor send requirements
GAOld site3 MWNovember 2025AskRequest detailsor send requirements
TXOld sitewarehouse building, 1.5k sq ft3 MWAugust 2026AskRequest detailsor send requirements
TXOld site2.5 MWMay 2026AskRequest detailsor send requirements

Power, land, and permits are already secured; cooling and electrical upgrades are on you for AI/HPC density.

County index, live

The same engine, watching by county.

Every scored site rolls up into a national county index. The counties pulsing below rank in the top ten percent for power readiness nationwide, kept current as new sites come in.

Loading the live map...

What we score

Fifteen scored dimensions across power, land, permitting, and risk. Each one is named and shown on your result, never buried inside a formula.

Power and grid
Power availabilityInterconnection speedTransmission proximityPower cost
Land and permitting
Parcel suitabilityLand costPermitting velocityIncentives
Environment and climate
Natural hazardWaterClimate and coolingEnvironmental
Risk and connectivity
Reliability and carbonCommunity riskFiber and latency
Get my Free Screening→