DC PlugSITES · CAPACITY · VERDICTSBook a demo
Home·Sample sites

Sample sites

A public preview of DC Plug's site ladder. Pick a tier below to see exactly what it delivers, then a sample site: one Prime, one Strong, one Watch, real named plants scored by the engine.

Sample library
Texas · ERCOT

North Lake

74
Composite
StrongNo power constraintreadiness 89· 93% confidence

Retired Texas generating station on ERCOT with full power availability and low power cost. Strong tier with no power constraint; the cooling-climate load is the weakest input.

Grid difficulty: too little local interconnection history in this county to score it honestly.
County power · market time-to-power 2 to 4 years · headroom constrained

Strong local interconnection redundancy tempers the county-level CONSTRAINED read toward MODERATE.

Active regulatory watch on this market since 2026-08-03.

County/market-level screening read, not a utility will-serve confirmation or a Phase 1 ESA.

Top 3 risks to clear
  • Climate and cooling (21)
    Confirm the cooling-load assumption for this climate.
  • Incentives (25)
    No confirmed abatement at this parcel, verify eligibility.
  • Parcel (40)
    Verify this factor directly before you commit.
Questions to ask before you commit
  • Is the existing interconnection agreement assignable, and at what MW?
  • What is the site's real deliverable power versus nameplate?
  • Any active local moratorium or zoning constraint on data-center use?

Not assessed for this site: Land / parcel, Land cost.

Verified facts
Existing grid interconnectionyes
Former plant nameplate708 MW
Grid voltage at POI138 kV
Flood designationzone X, not in a floodway
Evidence in the Deal Pack
Substation
NORTH LAKE 138 kV, 0.1 mi
Substation
Unnamed substation 345 kV, 1.6 mi
Serving utility
Oncor Electric Delivery Company Llc, Texas-New Mexico Power Co, City Of Garland - (Tx), Hilco Electric Cooperative, Inc., Farmers Electric Coop, Inc - (Tx), Trinity Valley Elec Coop Inc
Parcel of record
Temporarily unavailable: the underlying parcel data source is being restored, for every Deal Pack right now, not gated by tier.
Additional site intelligence
Power-path optionality: 29 substations in reach, nearest banks at 138/345 kV. Supports the 2N (dual substation) redundancy this load size typically expects.
Water-source optionality: 25 surface-water sources in reach (cooling-supply candidates). Volume and water rights are assessed at diligence.
Wildfire hazard (county): Relatively Low
Earthquake loss risk (county): Relatively Moderate
Seismic design category: B
Nearest dam: North Lake Dam, High-hazard, 0.2 mi
High-hazard dams within 6 mi: 4
Wetland share of parcel (approximate): 24.9%
Public water service area: outside a mapped service area
Nearest solar farm: Verizon Hidden Ridge Solar Project, 2.9 MW AC, 5.2 mi
Nearest wind turbine: Apogee Stadium Wind, 20.3 mi
Renewables PPA optionality: 6 solar / 2 wind projects in reach, potential PPA counterparties.
Large-load regulatory readiness: Unstructured (as of 2026-06-30)
Nearest major road: 2.1 mi
Nearest local road: Moore Rd, 0.1 mi
Nearest mainline rail: 0.3 mi
Nearest submarine cable: Pan-American Crossing (PAC), 884.4 mi
Design wet-bulb temperature (approximate): 77.6°F
Terrain / slope: flat (0.74%)
Download a full sample Deal Pack (PDF) →

A real Deal Pack on a sample powered site, the actual deliverable, one you can forward internally.

Estimated deliverable capacity
🔒deliverable MW held · 93% confidence
A modeled screening estimate, the figure is in the full read.
Full dimension breakdown, with confidence
power dimension
Power availability
98
Interconnection
98
Power cost
98
Transmission
66
Reliability and carbon
56
Water
71
Environmental
90
Zoning and permitting
85
Natural hazard
80
Fiber and latency
53
Community and political
50
Incentives
25
Climate and cooling
21
Parcel
40
Power: clear. Strong on every power dimension, so nothing here holds the composite back.
Diligence read
Advance to diligencedeliverable MW held
$13.0M / MW
Capex (benchmark)
🔒 held
Total build (modeled)
🔒
Months to energize
In the full build
pending deal terms
IRR
Federal ITC: 30% on on-site energy property
State incentive: TX: data-center sales/use-tax exemption (investment + jobs thresholds)
What could derail it: Climate and cooling (21), Incentives (25), Parcel (40)

Capex, ITC, and build figures are labeled public-benchmark assumptions, not quotes. IRR is left uncomputed until real lease or PPA terms are supplied, revenue is never invented.

Solution hooks
  • Cooling-water fit: moderate. A workable cooling-water route exists. The route, the source, and the permit path unlock in the full build.

Every gap the Deal Pack diagnoses gets a held solution hook. The answer, the route and the specifics, is the paid engagement.

Evidence and filings
  • Interconnection status on file
  • Retirement and capacity records on file
  • Flood determination, streamflow, and habitat checks on file
  • Regulatory filings tracked for this footprint

Every fact is cited. Data provenance is disclosed to the buyer under NDA.

Live grid profile · ERCOT
fossil 54.6%nuclear 7.2%renewable 38.5%
2.68 c/kWhday-ahead average
low volatility, spikes to 7.2 c/kWh
Regulatory signals
  • MED2026-06-23 · National
    US sees record Q1 2026 energy-storage installations
  • MED2026-06-24 · National
    First Street: 79% of global data-center capacity faces acute climate hazards

Detected and triaged automatically, refreshed nightly.

The route, the enabling supply, and the schedule for every gap this Deal Pack flagged are engineered in the full build.Scope the full build →
That was one site, in full

DC Plug ranks the whole country, and the sites you already track.

  • →Every powered site nationally, ranked and refreshable
  • →Your own candidate sites, scored the same way
  • →The full emerging-sites watchlist, not just five
  • →Live grid and regulatory feeds, refreshed nightly
  • →Per-site diligence on any site you pick
  • →The ranked map and sortable shortlist

A commercial platform, not a free signup. Book a demo to run it on your pipeline.

Book a demo→
HomeSample sitesSign in
© 2026 DC Plug
hello@dcplug.ai
Sample snapshot as of 2026-09-23. The live tool refreshes daily; figures here may drift from the live read.