SITES · CAPACITY · VERDICTS

Sites. Colo. Equipment. Verified.

01 / Site seekersFind a SiteAssess your own site, browse Discovery, or buy/lease a purpose-fit or convertible siteFind a site
02 / Colo spaceFind colo spaceVerified capacity for AI and GPU loads.Find capacity
03 / EquipmentFind equipmentTransformers and generators, buy or list.Browse

Not sure yet? See the demo on four real sites →

Data center map

Where the capacity is.

Data-center facilities around the world, shown by region.

Operational, under construction and planned data centers

Is your facility on it?List capacityFind capacity
Where power is hard to get

Getting power is the constraint. Here is where.

Most power projects that apply to connect never get built. Each county below is shaded by how many did: green where the grid is open, red where it is gridlocked. Two identical-looking sites can sit years apart on power.

Loading the difficulty map...
Built for your scale

Scored to the size you are building.

A one-megawatt edge build and a gigawatt campus are different searches. DC Plug scores every site against the load you plan to place on it.

Edge

1 to 50 MW

For Neoclouds, GPU startups, regional colocation, and operators repurposing existing sites for AI.

At this scale, power is rarely the constraint, and we say so plainly when it isn't. Land, community, permitting, and connectivity decide the site.

You get a ranked shortlist of sites with a short path to power.

Distributed

51 to 100 MW

For mid-size developers, behind-the-meter and reuse strategies, and enterprise operators.

The mid-market, assessed on its own terms, not as a scaled-down hyperscale search.

You get a ranked shortlist plus a closer read on the sites worth pursuing.

Hyperscale

100 MW+

For developers, land bankers, and infrastructure investors siting campuses.

At campus scale, power is the binding constraint, and no site advances until its power is real.

You get deep per-site diligence on whether a site can carry the campus.

One standard across every scale, tested against real outcomes.

Bring the megawatts, or the site.

Operators, buyers, and the developers and capital financing the buildout, on one verified book. Book a demo to run it on your pipeline.

Find a site · Find equipment · Find colo space